Home  /  Location & Incentives
POD 09

Where a centre is built is a retention decision and a capital decision before it is a property decision.

Location is routinely settled by cost per square foot and talent pool size. Two consequential facts are missed by that framing, and either one is large enough to change the answer.

Fact I

Location is retention strategy

Attrition in Tier-II cities runs materially below Tier-I across the board, and a large majority of centre leaders report that retention is meaningfully stronger there. For a centre losing high performers at rates approaching one in five in critical roles, the location decision is a retention intervention that most organisations never recognise as one.

Fact II

Location is recoverable capital

Indian states now compete actively for capability centres through dedicated policy frameworks offering capital and operating expenditure support — several with specific provisions for smaller centres carrying no minimum employment or investment threshold. Very few organisations model these into the location decision, and fewer still claim them competently.

The firm that treats location as a joint retention-and-capital problem reaches a materially different recommendation from the firm that treats it as property.
Three Workstreams

How the decision is actually made.

  1. Location Architecture

    Multi-hub design rather than single-site selection — a primary hub for scale and depth, satellites for specific capability or cost position, and the operating model that holds them together. A distributed centre without a designed operating model is not a network; it is a fragmentation. Assessed on talent depth by discipline, competitive intensity and consequent salary inflation, observed attrition differential, institutional pipeline, infrastructure, and the operating overhead of distribution.

  2. Incentive Recovery

    Mapping of applicable state and central provisions against the client’s specific profile, eligibility structuring, application preparation, and the disbursement compliance that determines whether an approved incentive is actually received. The distinction matters: incentives are frequently approved and then forfeited on documentation.

  3. Jurisdictional Structuring

    Where activity qualifies for a special jurisdiction — financial services in particular — the entity and location decisions interlock with the tax and regulatory regime. Delivered in concert with the Foundation POD and external counsel. Our role is orchestration and the people consequences, not the provision of legal or tax opinion.

Deliverables

What is handed over.

  • Multi-hub location architecture with scored assessment
  • Attrition differential model with cost-of-turnover quantified
  • Incentive eligibility map with recoverable value quantified
  • Application dossier and disbursement compliance calendar
  • Jurisdictional recommendation with structuring rationale
Commercial

Aligned to value realised, not applications filed.

A fixed advisory fee for the location architecture. Incentive recovery structured so that our interest tracks disbursed value rather than submissions made — which is the distinction a client will care about when the second instalment falls due.

The Resource Pool

Join as a GCC Resource.

Successgini maintains a proprietary pool of enterprise-ready professionals and fractional executives who build and operate capability centres. Registration is open to those with genuine centre-building experience.