Four routes to a capability centre.
The right structure depends on how much control you want on day one, how much risk you are willing to hold, and how quickly you intend to own the asset outright. Each model converts cleanly into the next.
Wholly Owned Subsidiary
You own the entity from inception. We build it, staff it and stand it up under your flag, then step back into an operating role of your choosing.
- Full ownership and sovereignty from day one
- Direct control of intellectual property and employment
- Longest establishment horizon, lowest long-run cost
- Suited to committed, multi-year capability strategies
Build–Operate–Transfer
We hold the entity, operate the centre against your standards and culture, and transfer it whole when you are ready to own it.
- Establishment risk carried by the operator
- Your culture, brand and reporting lines throughout
- Single-event transfer with no disruption to employees
- Transfer timing determined by you, not by contract
Managed GCC
A fully operated centre working under your direction, with no obligation to bring the entity onto your balance sheet.
- Operating and compliance load carried by us
- Scales up and down with demand
- No capital commitment or entity exposure
- Optional conversion to ownership at any point
Employer of Record
Test a market, seat a small team, or bridge the interval before an entity exists — compliantly, in weeks rather than quarters.
- No entity required
- Fastest route to a first cohort
- Full statutory and payroll compliance
- Clean migration into any model above
Locate yourself without needing a conversation.
| Dimension | Wholly Owned | BOT | Managed GCC | Employer of Record |
|---|---|---|---|---|
| Ownership at day one | Client | Operator | Operator | Operator |
| Establishment risk | Client | Operator | Operator | Operator |
| Time to first cohort | Longest | Moderate | Moderate | Shortest |
| Capital commitment | Full | None until transfer | None | None |
| Balance sheet exposure | Immediate | Deferred | None | None |
| Control of employment terms | Direct | Client standards | Client direction | Client direction |
| Exit position | Owned outright | Transfer of entity | Wind down or convert | Terminate or convert |
| Best suited to | Committed multi-year strategy | Intent to own, unwilling to carry build risk | Capability without entity appetite | Market validation |
Three phases, three decision gates.
Build
Entity establishment, statutory and regulatory foundation, policy architecture, payroll and compliance infrastructure. Organisation structure designed before population begins. The client may interview and approve every hire, including compensation position, or may delegate entirely. Gate: structure and first cohort approved.
Operate
The team reports into client management. The client retains complete control of work allocation, intellectual property and performance standards. Successgini carries the entity, the statutory obligations and the operating load. People architecture, reward design and the Hoshin cascade are installed during this phase, not deferred to the client after transfer. Gate: transfer readiness assessed against defined criteria.
Transfer
A single-event transfer of the legal entity. No re-hiring, no change to employment continuity, no interruption to delivery. Leadership, documentation and institutional memory transfer with it. Gate: completion, with defined post-transfer support.
Each model migrates into the next without re-hiring or re-contracting.
EOR → Managed GCC
Validation cohort migrates onto an operated entity once the model is proven. Employment continuity preserved; no break in service, no re-offer.
Managed GCC → BOT
Where the client forms an intention to own, the operated centre converts to a transfer-ready structure with defined criteria and a target date.
BOT → Wholly Owned
The terminal step. Entity transfers whole, and Successgini remains only in whatever operating role the client elects to retain.
A European parent frequently begins at Employer of Record specifically because it can be presented to a works council as a bounded pilot rather than a relocation.
